Bathroom installations

Bathrooms and en-suites built with tanked wet areas, sound plumbing and tiling that lines through.

Bathroom installations

Waterproofing done properly

Shower areas are tanked before tiling, with sealed corners and joints. It is the part nobody sees and the part that causes the most expensive failures when it is skipped.

Setting out the tiling

We dry-lay and set out tiling so cuts fall in sensible places and joints line through between floor and wall. Small detail, very visible result.

Typical programme

A standard family bathroom usually runs two to three weeks from strip-out to final seal, depending on tile choice and whether waste positions are moving.

Planning a project?

Book a site visit and get a costed schedule of works

Bring your drawings, sketches or just an idea. We will tell you what is realistic, what it is likely to cost and how long it should take.

Our process

Four stages, from first visit to handover

The same sequence on every project, whether it is a bathroom or a full renovation.

  1. 01

    Site visit & conversation

    We come out, look at the property, talk through what you want and tell you honestly whether it is realistic within your budget.

  2. 02

    Costed schedule of works

    You receive a written, itemised quotation broken down by stage, along with an indicative programme and payment schedule.

  3. 03

    The build

    A named project manager runs the site, co-ordinates trades and inspections, and sends you a short written update every Friday.

  4. 04

    Handover & aftercare

    We walk the finished project with you, complete the snagging list and hand over certificates, warranties and building control sign-off.