Restoration

Period hallway restoration

An Edwardian entrance hall restored, with reinstated tiling, repaired plaster mouldings and new joinery.

Period hallway restoration, Kew
Location
Kew
Project type
Restoration
Time on site
6 weeks

The brief

The hallway had been carpeted over and boxed in during the 1990s. The owners wanted the original entrance back.

What we did

Under the carpet we found around 60% of the original tiling intact. We lifted, cleaned and relaid it, sourcing matched replacements for the missing sections.

The detail that mattered

Plaster mouldings were repaired in situ using running moulds taken from the surviving lengths rather than replaced with modern coving.

Planning a project?

Book a site visit and get a costed schedule of works

Bring your drawings, sketches or just an idea. We will tell you what is realistic, what it is likely to cost and how long it should take.

Let's talk about your project

Tell us what you are hoping to do and we will come and take a proper look. No obligation, no hard sell.

Demo contact details only — nothing is sent from this website.